+86-595-22890181
E307 /CAT307 TRACK LINK

E307 /CAT307 TRACK LINK

Send Inquiry
Product Details ofE307 /CAT307 TRACK LINK

We undertake product customization

Brand: CAT

Type: Excavators

Model:E307 TRACK LINK

TRACK CHAIN GROUP

Weight:

 

Basic performance features:

1) The link is done by quenching and tempering as a whole with medium frequency quenched to ensure its high strength and wear resistance

2) After carburizing and surface medium frequency quenching, the track bushing gets reasonable core hardness and good wear resistance of inner and outer surface.

3) After quenching and tempering with medium frequency quenching, the track pin gets enough central strength and good wear resistance of the outer surface

 

Track Link Maintenance

Before enabling the track link, first check whether the link assembly is operating normally and whether the tension of the saw chain is normal.

Remember to close the chain brake before starting so as to stop the track link assembly and prevent danger during startup. But loosen the chain brake before work, otherwise the bearing will be damaged.

When the track link assembly rotates, be careful not to rub against the ground or other objects.

The link assembly should be oiled and applied with anti-rust paint in a timely manner. Once the track link assembly is rusted, it should be replaced in time to improve work efficiency.

Check and maintain the link assembly frequently, repair it in time if there is a broken link or disconnection, and find out the cause.

 

 

 

Our Service

♦ 100% quality assurance, develop and manufacture follow original ones;

♦ Reasonable stock and timely delivery;

♦ Quick response within 24 hours ;

♦ Long-term strong and steady supplying ability;

♦ One-to-one products factory. Ensure the best quality;

♦ The first-class logistics & Ensure that your goods arrived safely;

♦ Goods will Be packed safe & carefully;

♦ Excellent After-sales service. Track usage. Positive feedback response;

♦ Establish inquiry library for you, we are your professional sourcing consultant.

 

1. You are a trader or a manufacture?

We are an industry and trade integration business, our factory and sales department are located in Quanzhou Nanan Distric

2. How can I be sure the part will fit my machine?

Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

3. How about the payment terms?

We usually accept T/T, other terms also could be negotiated.

4. What is your minimum order?

It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable.

5. What about Quality Control?

We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.

 

Delivery Time:

Generally, if we have stock, it will take about 7-day delivery time. Or it will take about 20 to 50 days after receiving your advance payment. The specific delivery time depends on the items and quantity of your order.

 

Diagram of each part(Conventional)

1:Schematic diagram of  undercarriage parts

img-814-811img-771-580

2:Schematic diagram of excavator hydraulic cylinder

img-1027-767

3:Schematic diagram of idler 

img-740-528img-573-542

4:Schematic diagram of track roller

img-550-511img-726-538

5:Schematic diagram of track adjuster

img-483-613img-486-574

6:Schematic diagram of track group

img-923-727img-1024-768

7:Schematic diagram of sprocket(segment)

img-642-499img-646-415

8:Schematic diagram of top roller

img-589-617img-1098-724

9:Schematic diagram of hydraulic cylinder

 

img-1900-1200img-1024-768img-1900-1200

img-477-771img-392-640img-364-657

 

 

 

Hot Tags: E307 /CAT307 TRACK LINK, China, suppliers, manufacturers, factory, buy, Rubber Tracks, Sprocket, Track Link Assembly

Send Inquiry

(0/10)

clearall