+86-595-22890181
Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly

Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly

Track Link Assembly is the track group with shoes, which is also called track shoe plate, track shoe assy, it is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc.
Send Inquiry
Product Details of Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly

Product Introduction

We are driven by technological innovation and backed by scientific management to promote the continuous, rapid and healthy development of the enterprise. We are willing to sincerely cooperate with new and old customers to work hand in hand for the progress and development of the Cutting Edge And Plow Bolt Nut, Bulldozer Front And Rear Guide Idler Wheel, Excavator Sprocket industry. Our company's vision and mission is continuously strengthening technological innovation, upgrading products, and actively discovering and satisfying the diverse needs of different customers. We attach importance to every opportunity to serve you, welcome you to consult with us, and look forward to creating a win-win situation with you. In the future, we will continue to stick to the main business, positioning and culture, and be oriented to meet the multi scene consumption needs of users. Green security is an important goal and symbol of our own development, and also an important means to promote high-quality development.

Track Link Assembly is the track group with shoes, which is also called track shoe plate, track shoe assy, it is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc. Excavator track group with shoes is made by rolling, machining, heat treatment, painting etc. The quality and working life depends on the quality of rolled steel, the hardness of hardening and tempering, the depth of hardness lay.


Our Advantage:

• Material: 35MnB, high strength, abrasion resistant steel

• Track Bushing: 20CrMo, carburizing treatment both outside and inside, hardness depth 2.5 to 3mm.

• Heat Treatment: water quenching technology

• Machining: CNC CONTROLLED MACHINES

• Chain Models: link pitch from 101 to 260mm. .


Machining Process: Forging —Rough Turning —Heat Treatment—Flow Detection —Finish Turning — Assembly— Spraying Paint


Production Information

1


Specification:

2


NO

DIMENSION

MODEL APPLICABLE

A

B

C

H

I

O

P

Q

S

U

1

101

22

40

55

55

35

32

19

10.5

94

EX35, YC35-6/7

2

135

46

40

80

104

54

35.2

22.3

13.5

140

R60

3

135

46

41

55

85

31.6

35

22.5

12.5

114

PC40-5

4

135

46

41

63.8

93.8

40.4

35

22.5

12.5

124

PC40-7/8

5

135

43.2

42.5

72

99

44

41

24

12.5

141

PC60-5, D20

6

140

52

44

86

86

55

40

28

14.5

139

YC85

7

154

55

47.5

90

90

56

46.3

30

14.5

158

EX60

8

154

57

44

73

89

45

41.2

24

14.5

130

PC60-6/7, PC75

9

154

57

44

82.4

112.4

49.4

46.3

30

14.5

170

PC100-3, D31

10

171

60.3

55.57

108

108

58.6

47

30

16.5

170

SK100, SK120

11

171

60.3

55.57

108

108

70

50.3

33.5

16.5

181

EX100, E312, E120B, SH120, EC140

12

171

58.7

56.3

125.4

144.5

83.5

54

36.65

16.5

212

R200, SE210-1, SE210LC, R210LC-2

13

175

57

54

86.4

102.4

50.4

46.3

30

16.5

170

PC100-5/6, PC120-6

14

175

57

54

122.4

158.4

84.6

55

38

18.5

218

HD700, HD770

15

175.4

58.7

57.2

125.4

144.5

77.5

58.75

36.5

18.5

214

EX200-1, SH280

16

190

69

58

119.6

155.6

82.2

58.8

36.6

20.5

220

E200B, SH200, SK200, E320

17

190

62

58

124.4

160.4

81.6

59

38

18.5

220

PC200-3, PC220-1/2/3, EX200-2/5, ZX210

18

190

62

58

124.4

160.4

81.6

59

38

20.5

220

PC200-5/6/7, DH220-5, EX220

19

203

72

58

138.4

178.4

101.6

66.8

44.6

20.5

244

EX300-1, PC300-2

20

203

72

58

138.4

178.4

101.6

66.8

44.6

22.5

244

PC300-5

21

203

72

62

129

179

94

64

42

20.5

235

E325

22

203

76.2

58

148.2

186.2

112.4

66.8

44.6

19.5

254

R944

23

203

72

58

138.4

178.4

101.6

66.8

44.6

18.5

244

D60, D65, TY160

24

203

72

60

146

184

108

66

45

20.5

250

T160, T140, T120

25

203

76.2

58

133.4

171.4

102.4

69.7

44.5

19.5

232

D6D

26

203

68

64

137.3

185.3

101.3

72.7

44.5

20.5

232

D6H

27

216

76.2

63

140.4

178.4

101.6

66.5

44.6

22.5

242

PC300-6/7, EX300-5

28

216

76.2

63

146

184

106

71

47

22.5

252

EX400-1, PC400-1/3, DH450

29

216

76.2

69

140

190

103

68

46

22.5

248

E330

30

216

76.2

63

146

184

106

74.3

47

24.5

252

PC300-3/5, SH330, SH300, PC410-5

31

216

76.2

63

146

184

106

74.3

47

20.5

252

D80, D85, TY220, TY230

32

216

76.2

64.3

146

184

108

71

47.7

19.5

252

D7G

33

228

76.2

71.4

144

184

109

71.5

47

24.5

254

PC400-6

34

228

76.2

71.4

169

219

121.6

79

48.5

24.5

292

D155, D150, TY320

35

228

76.2

71.4

169.8

201.6

121.6

80.4

50.8

23

292

D8K

36

260

76.2

87.3

184.2

235

133

85.3

57

27.5

321

EX700, ZX1000

37

260

76.2

87.3

184.2

235

133

92

57

27.5

321

D355, PD410, D9H, D9G


Package And Service

3


Track Link Maintenance

Before enabling the track link, first check whether the link assembly is operating normally and whether the tension of the saw chain is normal.

Remember to close the chain brake before starting so as to stop the track link assembly and prevent danger during startup. But loosen the chain brake before work, otherwise the bearing will be damaged.

When the track link assembly rotates, be careful not to rub against the ground or other objects.

The link assembly should be oiled and applied with anti-rust paint in a timely manner. Once the track link assembly is rusted, it should be replaced in time to improve work efficiency.

Check and maintain the link assembly frequently, repair it in time if there is a broken link or disconnection, and find out the cause.


In the past few years, we have cooperated with major domestic Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly manufacturers as well as state-owned enterprises, private enterprises and other end customers, and have been well received. As our service tenet said we do what we said ,serve attentively. Our Persistent endeavors aim to win recognition from more customers. Our company is working by the operation principle of 'integrity-based, cooperation created, people oriented, win-win cooperation'.

Hot Tags: track link assembly, China, suppliers, manufacturers, factory, buy, Mini Excavator Idler Wheel, Track Adjuster Assy, Bucket Teeth, Bulldozer Upper Carrier Roller, Carrier Roller, Bucket Cutting Edge Blade And End Bits

[[ProKeywords]]

SPEC DATA

Send Inquiry

Send a Message