
Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly
Product Introduction
We are driven by technological innovation and backed by scientific management to promote the continuous, rapid and healthy development of the enterprise. We are willing to sincerely cooperate with new and old customers to work hand in hand for the progress and development of the Cutting Edge And Plow Bolt Nut, Bulldozer Front And Rear Guide Idler Wheel, Excavator Sprocket industry. Our company's vision and mission is continuously strengthening technological innovation, upgrading products, and actively discovering and satisfying the diverse needs of different customers. We attach importance to every opportunity to serve you, welcome you to consult with us, and look forward to creating a win-win situation with you. In the future, we will continue to stick to the main business, positioning and culture, and be oriented to meet the multi scene consumption needs of users. Green security is an important goal and symbol of our own development, and also an important means to promote high-quality development.
Track Link Assembly is the track group with shoes, which is also called track shoe plate, track shoe assy, it is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc. Excavator track group with shoes is made by rolling, machining, heat treatment, painting etc. The quality and working life depends on the quality of rolled steel, the hardness of hardening and tempering, the depth of hardness lay.
Our Advantage:
• Material: 35MnB, high strength, abrasion resistant steel
• Track Bushing: 20CrMo, carburizing treatment both outside and inside, hardness depth 2.5 to 3mm.
• Heat Treatment: water quenching technology
• Machining: CNC CONTROLLED MACHINES
• Chain Models: link pitch from 101 to 260mm. .
Machining Process: Forging —Rough Turning —Heat Treatment—Flow Detection —Finish Turning — Assembly— Spraying Paint
Production Information

Specification:

NO | DIMENSION | MODEL APPLICABLE | |||||||||
A | B | C | H | I | O | P | Q | S | U | ||
1 | 101 | 22 | 40 | 55 | 55 | 35 | 32 | 19 | 10.5 | 94 | EX35, YC35-6/7 |
2 | 135 | 46 | 40 | 80 | 104 | 54 | 35.2 | 22.3 | 13.5 | 140 | R60 |
3 | 135 | 46 | 41 | 55 | 85 | 31.6 | 35 | 22.5 | 12.5 | 114 | PC40-5 |
4 | 135 | 46 | 41 | 63.8 | 93.8 | 40.4 | 35 | 22.5 | 12.5 | 124 | PC40-7/8 |
5 | 135 | 43.2 | 42.5 | 72 | 99 | 44 | 41 | 24 | 12.5 | 141 | PC60-5, D20 |
6 | 140 | 52 | 44 | 86 | 86 | 55 | 40 | 28 | 14.5 | 139 | YC85 |
7 | 154 | 55 | 47.5 | 90 | 90 | 56 | 46.3 | 30 | 14.5 | 158 | EX60 |
8 | 154 | 57 | 44 | 73 | 89 | 45 | 41.2 | 24 | 14.5 | 130 | PC60-6/7, PC75 |
9 | 154 | 57 | 44 | 82.4 | 112.4 | 49.4 | 46.3 | 30 | 14.5 | 170 | PC100-3, D31 |
10 | 171 | 60.3 | 55.57 | 108 | 108 | 58.6 | 47 | 30 | 16.5 | 170 | SK100, SK120 |
11 | 171 | 60.3 | 55.57 | 108 | 108 | 70 | 50.3 | 33.5 | 16.5 | 181 | EX100, E312, E120B, SH120, EC140 |
12 | 171 | 58.7 | 56.3 | 125.4 | 144.5 | 83.5 | 54 | 36.65 | 16.5 | 212 | R200, SE210-1, SE210LC, R210LC-2 |
13 | 175 | 57 | 54 | 86.4 | 102.4 | 50.4 | 46.3 | 30 | 16.5 | 170 | PC100-5/6, PC120-6 |
14 | 175 | 57 | 54 | 122.4 | 158.4 | 84.6 | 55 | 38 | 18.5 | 218 | HD700, HD770 |
15 | 175.4 | 58.7 | 57.2 | 125.4 | 144.5 | 77.5 | 58.75 | 36.5 | 18.5 | 214 | EX200-1, SH280 |
16 | 190 | 69 | 58 | 119.6 | 155.6 | 82.2 | 58.8 | 36.6 | 20.5 | 220 | E200B, SH200, SK200, E320 |
17 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 18.5 | 220 | PC200-3, PC220-1/2/3, EX200-2/5, ZX210 |
18 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 20.5 | 220 | PC200-5/6/7, DH220-5, EX220 |
19 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 20.5 | 244 | EX300-1, PC300-2 |
20 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 22.5 | 244 | PC300-5 |
21 | 203 | 72 | 62 | 129 | 179 | 94 | 64 | 42 | 20.5 | 235 | E325 |
22 | 203 | 76.2 | 58 | 148.2 | 186.2 | 112.4 | 66.8 | 44.6 | 19.5 | 254 | R944 |
23 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 18.5 | 244 | D60, D65, TY160 |
24 | 203 | 72 | 60 | 146 | 184 | 108 | 66 | 45 | 20.5 | 250 | T160, T140, T120 |
25 | 203 | 76.2 | 58 | 133.4 | 171.4 | 102.4 | 69.7 | 44.5 | 19.5 | 232 | D6D |
26 | 203 | 68 | 64 | 137.3 | 185.3 | 101.3 | 72.7 | 44.5 | 20.5 | 232 | D6H |
27 | 216 | 76.2 | 63 | 140.4 | 178.4 | 101.6 | 66.5 | 44.6 | 22.5 | 242 | PC300-6/7, EX300-5 |
28 | 216 | 76.2 | 63 | 146 | 184 | 106 | 71 | 47 | 22.5 | 252 | EX400-1, PC400-1/3, DH450 |
29 | 216 | 76.2 | 69 | 140 | 190 | 103 | 68 | 46 | 22.5 | 248 | E330 |
30 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 24.5 | 252 | PC300-3/5, SH330, SH300, PC410-5 |
31 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 20.5 | 252 | D80, D85, TY220, TY230 |
32 | 216 | 76.2 | 64.3 | 146 | 184 | 108 | 71 | 47.7 | 19.5 | 252 | D7G |
33 | 228 | 76.2 | 71.4 | 144 | 184 | 109 | 71.5 | 47 | 24.5 | 254 | PC400-6 |
34 | 228 | 76.2 | 71.4 | 169 | 219 | 121.6 | 79 | 48.5 | 24.5 | 292 | D155, D150, TY320 |
35 | 228 | 76.2 | 71.4 | 169.8 | 201.6 | 121.6 | 80.4 | 50.8 | 23 | 292 | D8K |
36 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 85.3 | 57 | 27.5 | 321 | EX700, ZX1000 |
37 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 92 | 57 | 27.5 | 321 | D355, PD410, D9H, D9G |
Package And Service

Track Link Maintenance
Before enabling the track link, first check whether the link assembly is operating normally and whether the tension of the saw chain is normal.
Remember to close the chain brake before starting so as to stop the track link assembly and prevent danger during startup. But loosen the chain brake before work, otherwise the bearing will be damaged.
When the track link assembly rotates, be careful not to rub against the ground or other objects.
The link assembly should be oiled and applied with anti-rust paint in a timely manner. Once the track link assembly is rusted, it should be replaced in time to improve work efficiency.
Check and maintain the link assembly frequently, repair it in time if there is a broken link or disconnection, and find out the cause.
In the past few years, we have cooperated with major domestic Track Chain Excavator Track Chain Track Link PC200-5 PC200-6 PC200-7 PC200-8 Track Link Assembly manufacturers as well as state-owned enterprises, private enterprises and other end customers, and have been well received. As our service tenet said we do what we said ,serve attentively. Our Persistent endeavors aim to win recognition from more customers. Our company is working by the operation principle of 'integrity-based, cooperation created, people oriented, win-win cooperation'.
Hot Tags: track link assembly, China, suppliers, manufacturers, factory, buy, Mini Excavator Idler Wheel, Track Adjuster Assy, Bucket Teeth, Bulldozer Upper Carrier Roller, Carrier Roller, Bucket Cutting Edge Blade And End Bits
[[ProKeywords]]SPEC DATA
Send Inquiry