
Kobelco Cks900 Crawler Crane Idler
Product Introduction
We regard the good faith as the foundation, take the quality as the first, base on the technology and innovation, wholeheartedly provide the high-quality Excavator Sprocket, Bulldozer Sprocket, Mini Excavator Sprocket and the perfect after-sale service for the customers at home and abroad. We believe that competitiveness is our driver, that quality is our guarantee and that service is our foundation. Adhering to our moto of 'Excellent Quality, Continuous Development, Continuous Improvement and Customer Satisfaction', we strive to maintain long term partnerships with our customers.
Crawler Crane Idler/Idler Assy/Idler Tumbler/Front Idler
It's used to guide the crawler correctly move and prevent deviation. Meanwhile, the idler also act as the lower roller, can increase the land area of the track shoes assy to the ground, reduce the ground pressure ratio.

1, Cross Reference: front idler for crawler crane, idler wheel
2, Mechanical Performance:
Material: 35SiMn
Process: casting
Hardness: surface HRC52-56, internal HRC36-42
Seal: sizeable oil capacity and perfect sealing
Warranty: 12 months
Certification: ISO 9001
3, Advantages
Precision design, Perfect alignment, Good structural support
Exclusive seal groups ensure excellent performance up to -40°C
Applicable to any working condition with longer life and perfect operation
Seal groups provide wear-resistance & anti-rusting properties
Resistance to deformation as well as surface hardening for longer life
4, Production Process

5, Application For The Following Crawler Cranes:
HITACHI | |||||
KH100 | KH100-2/3 | KH125 | KH150 | KH180 | KH300 |
KH500 | KH700 | KH850 | KH1000 | ||
IHI | |||||
CCH250W | CCH280W | CCH500 | DCH700 | DCH800 | CCH800 |
CCH1500E | CCH2500 | ||||
KOBELCO | |||||
CKE600 | CKE800 | CKE900 | CKE1200 | CKE1800 | CKE2500 |
BM500 | BM700 | BM800 | P&H335 | P&H440 | P&H550 |
P&H5035 | P&H5045 | 7035 | 7045 | 7055 | 7065 |
7080 | 7090 | 7100 | 7120 | 7150 | 7200 |
7250 | 7300 | ||||
SUMITOMO | |||||
SC500 | SC500-2 | SC700 | SC2500 | LS78RM | LS108 |
LS118-5 | LS120 | LS218 | LS238 | LS248 | LS368 |
LS468 | SA1700 | ||||
FUWA | |||||
CC40 | QUY35 | QUY50 | QUY50A | QUY50C | QUY55 |
QUY70 | QUY70A | QUY80 | QUY80A | QUY80B | QUY90 |
QUY100 | QUY100A | QUY120 | QUY150 | QUY150A | QUY150C |
QUY250 | QUY320 | QUY400 | QUY400A | QUY500 | QUY650 |
QUY750 | QUY1250 | FWX55 | FWX75 | FWX85 | FWX135 |
FWX8185 | FWX225 | FWX285 | |||
SANY | |||||
SCC500 | SCC600 | SCC750 | SCC800 | SCC1000 | SCC1250 |
SCC1500 | SCC1800 | SCC2600 | SCC4000 | SCC6500 | SCC7500 |
SCC10000 | SCC16000 | ||||
XCMG | |||||
QUY50 | QUY55 | QUY70 | QUY100 | QUY150 | QUY260 |
QUY300 | QUY350 | QUY400 | QUY450 | QUY650 | XGC100 |
XGC130 | XGC150 | XGC650 | |||
ZOOMLION | |||||
QUY50 | QUY70 | QUY80 | QUY100 | QUY180 | QUY260 |
QUY320 | QUY350 | QUY500 | ZCC550 | ZCC550H | ZCC750 |
ZCC750H | ZCC800 | ZCC850 | ZCC850H | ZCC1100 | ZCC1100H |
ZCC1300 | ZCC1300CL | ZCC1800 | ZCC2600 | ZCC3800 | ZCC5000 |
QUY500 | |||||
MANITOWOC | |||||
M250 | M999 | M2250 | M4600 | M18000 | M21000 |
4100WS1 | 4100S | 4600S4 | |||
TEREX DEMAG | |||||
CC1400 | CC1800 | CC2000 | CC2200 | CC2500 | CC2800 |
CC5800 | |||||
Crawler Crane Idler Daily Maintenance:
When idler worn out to extreme dimensions, you can repair by welded, or even replace new idler.
1. Keep the crawler track to the proper tensioning. If too tight, under the force of the idler tensioning spring, it can cause the accelerated wear of idler shaft and bushing, track shoe and its pin, also lead to the pitch of track shoe elongate.
2. Keep the idler alignment. If not, will leads to other undercarriage parts (such as lower roller, upper roller, sprocket, track shoe) abnormal wear.
Our Service
♦ 100% quality assurance, development and manufacturing follow original ones;
♦ One-to-one products factory. Ensure the best quality;
♦ Reasonable inventory and timely delivery;
♦ Rapid response within 24 hours ;
♦ Long-term strong and stable supply capacity;
♦ Goods will Be packed safely and carefully;
♦ The first-class logistics to Ensure the safe arrival of your goods;
♦ Excellent After-sales service. Track usage. Positive feedback response;
We always regard customer satisfaction as our pursuit goal. Adhering to the business philosophy of honesty, cooperation and value creation, our company has become an all-round high-level professional supplier of Kobelco Cks900 Crawler Crane Idler. In the international cooperation business, we actively guide and constrain enterprises to produce, construct and operate in accordance with international ecological and environmental protection concepts and relevant regulations, and promote the organic unity of economic, social and ecological benefits. We regard healthy competition as the eternal driving force of enterprise and personal development.
Hot Tags: crawler crane idler, China, suppliers, manufacturers, factory, buy, Hydraulic Gear Pump, Excavator Track Shoe, Crawler Crane Idler, Bulldozer Lower Track Roller, Crawler Crane Track Pads, Digging Buckets
[[ProKeywords]]SPEC DATA
Send Inquiry