
Jining Excavator PC200-1 Track Chain PC200-7 Track Link Assembly
Product Introduction
We are committed to providing more competitive Mini Excavator Sprocket, Track Chain, Sprocket and supporting services that even more exceed customer expectations. We provide reasonable and reliable advice. Quality assurance is a basic requirement for establishment and maintenance of the long-term cooperation relationship of the supply chain. We break down people barriers to ensure you get what you want to the level you expect, when you want it. Our company makes the staff realize the enterprise culture, understand the necessity of enterprise culture construction, stimulate the enthusiasm of staff participation, so as to create a good atmosphere of enterprise culture construction.
Track Link Assembly is the track group with shoes, which is also called track shoe plate, track shoe assy, it is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc. Excavator track group with shoes is made by rolling, machining, heat treatment, painting etc. The quality and working life depends on the quality of rolled steel, the hardness of hardening and tempering, the depth of hardness lay.
Our Advantage:
• Material: 35MnB, high strength, abrasion resistant steel
• Track Bushing: 20CrMo, carburizing treatment both outside and inside, hardness depth 2.5 to 3mm.
• Heat Treatment: water quenching technology
• Machining: CNC CONTROLLED MACHINES
• Chain Models: link pitch from 101 to 260mm. .
Machining Process: Forging —Rough Turning —Heat Treatment—Flow Detection —Finish Turning — Assembly— Spraying Paint
Production Information

Specification:

NO | DIMENSION | MODEL APPLICABLE | |||||||||
A | B | C | H | I | O | P | Q | S | U | ||
1 | 101 | 22 | 40 | 55 | 55 | 35 | 32 | 19 | 10.5 | 94 | EX35, YC35-6/7 |
2 | 135 | 46 | 40 | 80 | 104 | 54 | 35.2 | 22.3 | 13.5 | 140 | R60 |
3 | 135 | 46 | 41 | 55 | 85 | 31.6 | 35 | 22.5 | 12.5 | 114 | PC40-5 |
4 | 135 | 46 | 41 | 63.8 | 93.8 | 40.4 | 35 | 22.5 | 12.5 | 124 | PC40-7/8 |
5 | 135 | 43.2 | 42.5 | 72 | 99 | 44 | 41 | 24 | 12.5 | 141 | PC60-5, D20 |
6 | 140 | 52 | 44 | 86 | 86 | 55 | 40 | 28 | 14.5 | 139 | YC85 |
7 | 154 | 55 | 47.5 | 90 | 90 | 56 | 46.3 | 30 | 14.5 | 158 | EX60 |
8 | 154 | 57 | 44 | 73 | 89 | 45 | 41.2 | 24 | 14.5 | 130 | PC60-6/7, PC75 |
9 | 154 | 57 | 44 | 82.4 | 112.4 | 49.4 | 46.3 | 30 | 14.5 | 170 | PC100-3, D31 |
10 | 171 | 60.3 | 55.57 | 108 | 108 | 58.6 | 47 | 30 | 16.5 | 170 | SK100, SK120 |
11 | 171 | 60.3 | 55.57 | 108 | 108 | 70 | 50.3 | 33.5 | 16.5 | 181 | EX100, E312, E120B, SH120, EC140 |
12 | 171 | 58.7 | 56.3 | 125.4 | 144.5 | 83.5 | 54 | 36.65 | 16.5 | 212 | R200, SE210-1, SE210LC, R210LC-2 |
13 | 175 | 57 | 54 | 86.4 | 102.4 | 50.4 | 46.3 | 30 | 16.5 | 170 | PC100-5/6, PC120-6 |
14 | 175 | 57 | 54 | 122.4 | 158.4 | 84.6 | 55 | 38 | 18.5 | 218 | HD700, HD770 |
15 | 175.4 | 58.7 | 57.2 | 125.4 | 144.5 | 77.5 | 58.75 | 36.5 | 18.5 | 214 | EX200-1, SH280 |
16 | 190 | 69 | 58 | 119.6 | 155.6 | 82.2 | 58.8 | 36.6 | 20.5 | 220 | E200B, SH200, SK200, E320 |
17 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 18.5 | 220 | PC200-3, PC220-1/2/3, EX200-2/5, ZX210 |
18 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 20.5 | 220 | PC200-5/6/7, DH220-5, EX220 |
19 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 20.5 | 244 | EX300-1, PC300-2 |
20 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 22.5 | 244 | PC300-5 |
21 | 203 | 72 | 62 | 129 | 179 | 94 | 64 | 42 | 20.5 | 235 | E325 |
22 | 203 | 76.2 | 58 | 148.2 | 186.2 | 112.4 | 66.8 | 44.6 | 19.5 | 254 | R944 |
23 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 18.5 | 244 | D60, D65, TY160 |
24 | 203 | 72 | 60 | 146 | 184 | 108 | 66 | 45 | 20.5 | 250 | T160, T140, T120 |
25 | 203 | 76.2 | 58 | 133.4 | 171.4 | 102.4 | 69.7 | 44.5 | 19.5 | 232 | D6D |
26 | 203 | 68 | 64 | 137.3 | 185.3 | 101.3 | 72.7 | 44.5 | 20.5 | 232 | D6H |
27 | 216 | 76.2 | 63 | 140.4 | 178.4 | 101.6 | 66.5 | 44.6 | 22.5 | 242 | PC300-6/7, EX300-5 |
28 | 216 | 76.2 | 63 | 146 | 184 | 106 | 71 | 47 | 22.5 | 252 | EX400-1, PC400-1/3, DH450 |
29 | 216 | 76.2 | 69 | 140 | 190 | 103 | 68 | 46 | 22.5 | 248 | E330 |
30 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 24.5 | 252 | PC300-3/5, SH330, SH300, PC410-5 |
31 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 20.5 | 252 | D80, D85, TY220, TY230 |
32 | 216 | 76.2 | 64.3 | 146 | 184 | 108 | 71 | 47.7 | 19.5 | 252 | D7G |
33 | 228 | 76.2 | 71.4 | 144 | 184 | 109 | 71.5 | 47 | 24.5 | 254 | PC400-6 |
34 | 228 | 76.2 | 71.4 | 169 | 219 | 121.6 | 79 | 48.5 | 24.5 | 292 | D155, D150, TY320 |
35 | 228 | 76.2 | 71.4 | 169.8 | 201.6 | 121.6 | 80.4 | 50.8 | 23 | 292 | D8K |
36 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 85.3 | 57 | 27.5 | 321 | EX700, ZX1000 |
37 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 92 | 57 | 27.5 | 321 | D355, PD410, D9H, D9G |
Package And Service

Track Link Maintenance
Before enabling the track link, first check whether the link assembly is operating normally and whether the tension of the saw chain is normal.
Remember to close the chain brake before starting so as to stop the track link assembly and prevent danger during startup. But loosen the chain brake before work, otherwise the bearing will be damaged.
When the track link assembly rotates, be careful not to rub against the ground or other objects.
The link assembly should be oiled and applied with anti-rust paint in a timely manner. Once the track link assembly is rusted, it should be replaced in time to improve work efficiency.
Check and maintain the link assembly frequently, repair it in time if there is a broken link or disconnection, and find out the cause.
In the future, we will be based on leading technology, rich products, perfect quality, professional services, and encourage industry elites to promote the healthy and rapid development of the global Jining Excavator PC200-1 Track Chain PC200-7 Track Link Assembly industry. We are constantly innovating our company's development model with products that lead the industry in consumption trends. Our company has a team of experienced, well-trained, disciplined and energetic professionals.
Hot Tags: track link assembly, China, suppliers, manufacturers, factory, buy, Sprocket For Crawler Crane, Track Adjuster Assy, Idler, Track Shoe Plate, Split Master Link Bolts, Hydraulic Cylinder
[[ProKeywords]]SPEC DATA
Send Inquiry