
Front Idler for Hitachi Kh180-2 Crawler Crane
Product Introduction
We are a professional manufacturer of Hydraulic Pump, Bucket Bushing, Bucket Pin. Since its establishment, our company has maintained a long-term and extensive cooperative relationship with world-renowned enterprises. Our products have won the favor of customers. We cultivate a common sense of collective honor and created a positive, progressive work atmosphere. Our company adheres to the principle of high quality and customer first, and develops markets with excellent service and flexible business model.
Crawler Crane Idler/Idler Assy/Idler Tumbler/Front Idler
It's used to guide the crawler correctly move and prevent deviation. Meanwhile, the idler also act as the lower roller, can increase the land area of the track shoes assy to the ground, reduce the ground pressure ratio.

1, Cross Reference: front idler for crawler crane, idler wheel
2, Mechanical Performance:
Material: 35SiMn
Process: casting
Hardness: surface HRC52-56, internal HRC36-42
Seal: sizeable oil capacity and perfect sealing
Warranty: 12 months
Certification: ISO 9001
3, Advantages
Precision design, Perfect alignment, Good structural support
Exclusive seal groups ensure excellent performance up to -40°C
Applicable to any working condition with longer life and perfect operation
Seal groups provide wear-resistance & anti-rusting properties
Resistance to deformation as well as surface hardening for longer life
4, Production Process

5, Application For The Following Crawler Cranes:
HITACHI | |||||
KH100 | KH100-2/3 | KH125 | KH150 | KH180 | KH300 |
KH500 | KH700 | KH850 | KH1000 | ||
IHI | |||||
CCH250W | CCH280W | CCH500 | DCH700 | DCH800 | CCH800 |
CCH1500E | CCH2500 | ||||
KOBELCO | |||||
CKE600 | CKE800 | CKE900 | CKE1200 | CKE1800 | CKE2500 |
BM500 | BM700 | BM800 | P&H335 | P&H440 | P&H550 |
P&H5035 | P&H5045 | 7035 | 7045 | 7055 | 7065 |
7080 | 7090 | 7100 | 7120 | 7150 | 7200 |
7250 | 7300 | ||||
SUMITOMO | |||||
SC500 | SC500-2 | SC700 | SC2500 | LS78RM | LS108 |
LS118-5 | LS120 | LS218 | LS238 | LS248 | LS368 |
LS468 | SA1700 | ||||
FUWA | |||||
CC40 | QUY35 | QUY50 | QUY50A | QUY50C | QUY55 |
QUY70 | QUY70A | QUY80 | QUY80A | QUY80B | QUY90 |
QUY100 | QUY100A | QUY120 | QUY150 | QUY150A | QUY150C |
QUY250 | QUY320 | QUY400 | QUY400A | QUY500 | QUY650 |
QUY750 | QUY1250 | FWX55 | FWX75 | FWX85 | FWX135 |
FWX8185 | FWX225 | FWX285 | |||
SANY | |||||
SCC500 | SCC600 | SCC750 | SCC800 | SCC1000 | SCC1250 |
SCC1500 | SCC1800 | SCC2600 | SCC4000 | SCC6500 | SCC7500 |
SCC10000 | SCC16000 | ||||
XCMG | |||||
QUY50 | QUY55 | QUY70 | QUY100 | QUY150 | QUY260 |
QUY300 | QUY350 | QUY400 | QUY450 | QUY650 | XGC100 |
XGC130 | XGC150 | XGC650 | |||
ZOOMLION | |||||
QUY50 | QUY70 | QUY80 | QUY100 | QUY180 | QUY260 |
QUY320 | QUY350 | QUY500 | ZCC550 | ZCC550H | ZCC750 |
ZCC750H | ZCC800 | ZCC850 | ZCC850H | ZCC1100 | ZCC1100H |
ZCC1300 | ZCC1300CL | ZCC1800 | ZCC2600 | ZCC3800 | ZCC5000 |
QUY500 | |||||
MANITOWOC | |||||
M250 | M999 | M2250 | M4600 | M18000 | M21000 |
4100WS1 | 4100S | 4600S4 | |||
TEREX DEMAG | |||||
CC1400 | CC1800 | CC2000 | CC2200 | CC2500 | CC2800 |
CC5800 | |||||
Crawler Crane Idler Daily Maintenance:
When idler worn out to extreme dimensions, you can repair by welded, or even replace new idler.
1. Keep the crawler track to the proper tensioning. If too tight, under the force of the idler tensioning spring, it can cause the accelerated wear of idler shaft and bushing, track shoe and its pin, also lead to the pitch of track shoe elongate.
2. Keep the idler alignment. If not, will leads to other undercarriage parts (such as lower roller, upper roller, sprocket, track shoe) abnormal wear.
Our Service
♦ 100% quality assurance, development and manufacturing follow original ones;
♦ One-to-one products factory. Ensure the best quality;
♦ Reasonable inventory and timely delivery;
♦ Rapid response within 24 hours ;
♦ Long-term strong and stable supply capacity;
♦ Goods will Be packed safely and carefully;
♦ The first-class logistics to Ensure the safe arrival of your goods;
♦ Excellent After-sales service. Track usage. Positive feedback response;
In the production process, we actively improve technology and continuously upgrade quality of Front Idler for Hitachi Kh180-2 Crawler Crane. We uphold the passion and excellence corporate philosophy, insist on taking the road of modern enterprise development through years of unremitting efforts. We keep up with the pace of the times, aiming at the foreign trade market.
Hot Tags: crawler crane idler, China, suppliers, manufacturers, factory, buy, Sprocket For Crawler Crane, Hydraulic Pump, Track Shoe Plate, Crawler Crane Idler, Digging Buckets, Bulldozer Front And Rear Guide Idler Wheel
[[ProKeywords]]SPEC DATA
Send Inquiry