
Front Idler for Hitachi Cx500 Crawler Crane
Product Introduction
With the goal of building a sustainable and international Digging Buckets, Excavator Bottom Roller, Segment Bolt Nut industry, we are committed to providing better products and more considerate services to global consumers. Our company is committed to improving the quality of employees, creating first-class quality, providing you with satisfactory products and services with standardized management, and striving to meet your requirements. We actively adopt new technologies, new processes, and new equipment, and our product quality is always in a leading position in the industry. We always unswervingly maintain the unique characteristics of the enterprise, and take this as a strategic goal. We adhere to the customer-centric, improve service quality, standardize service behavior, and provide value-added services.
Crawler Crane Idler/Idler Assy/Idler Tumbler/Front Idler
It's used to guide the crawler correctly move and prevent deviation. Meanwhile, the idler also act as the lower roller, can increase the land area of the track shoes assy to the ground, reduce the ground pressure ratio.

1, Cross Reference: front idler for crawler crane, idler wheel
2, Mechanical Performance:
Material: 35SiMn
Process: casting
Hardness: surface HRC52-56, internal HRC36-42
Seal: sizeable oil capacity and perfect sealing
Warranty: 12 months
Certification: ISO 9001
3, Advantages
Precision design, Perfect alignment, Good structural support
Exclusive seal groups ensure excellent performance up to -40°C
Applicable to any working condition with longer life and perfect operation
Seal groups provide wear-resistance & anti-rusting properties
Resistance to deformation as well as surface hardening for longer life
4, Production Process

5, Application For The Following Crawler Cranes:
HITACHI | |||||
KH100 | KH100-2/3 | KH125 | KH150 | KH180 | KH300 |
KH500 | KH700 | KH850 | KH1000 | ||
IHI | |||||
CCH250W | CCH280W | CCH500 | DCH700 | DCH800 | CCH800 |
CCH1500E | CCH2500 | ||||
KOBELCO | |||||
CKE600 | CKE800 | CKE900 | CKE1200 | CKE1800 | CKE2500 |
BM500 | BM700 | BM800 | P&H335 | P&H440 | P&H550 |
P&H5035 | P&H5045 | 7035 | 7045 | 7055 | 7065 |
7080 | 7090 | 7100 | 7120 | 7150 | 7200 |
7250 | 7300 | ||||
SUMITOMO | |||||
SC500 | SC500-2 | SC700 | SC2500 | LS78RM | LS108 |
LS118-5 | LS120 | LS218 | LS238 | LS248 | LS368 |
LS468 | SA1700 | ||||
FUWA | |||||
CC40 | QUY35 | QUY50 | QUY50A | QUY50C | QUY55 |
QUY70 | QUY70A | QUY80 | QUY80A | QUY80B | QUY90 |
QUY100 | QUY100A | QUY120 | QUY150 | QUY150A | QUY150C |
QUY250 | QUY320 | QUY400 | QUY400A | QUY500 | QUY650 |
QUY750 | QUY1250 | FWX55 | FWX75 | FWX85 | FWX135 |
FWX8185 | FWX225 | FWX285 | |||
SANY | |||||
SCC500 | SCC600 | SCC750 | SCC800 | SCC1000 | SCC1250 |
SCC1500 | SCC1800 | SCC2600 | SCC4000 | SCC6500 | SCC7500 |
SCC10000 | SCC16000 | ||||
XCMG | |||||
QUY50 | QUY55 | QUY70 | QUY100 | QUY150 | QUY260 |
QUY300 | QUY350 | QUY400 | QUY450 | QUY650 | XGC100 |
XGC130 | XGC150 | XGC650 | |||
ZOOMLION | |||||
QUY50 | QUY70 | QUY80 | QUY100 | QUY180 | QUY260 |
QUY320 | QUY350 | QUY500 | ZCC550 | ZCC550H | ZCC750 |
ZCC750H | ZCC800 | ZCC850 | ZCC850H | ZCC1100 | ZCC1100H |
ZCC1300 | ZCC1300CL | ZCC1800 | ZCC2600 | ZCC3800 | ZCC5000 |
QUY500 | |||||
MANITOWOC | |||||
M250 | M999 | M2250 | M4600 | M18000 | M21000 |
4100WS1 | 4100S | 4600S4 | |||
TEREX DEMAG | |||||
CC1400 | CC1800 | CC2000 | CC2200 | CC2500 | CC2800 |
CC5800 | |||||
Crawler Crane Idler Daily Maintenance:
When idler worn out to extreme dimensions, you can repair by welded, or even replace new idler.
1. Keep the crawler track to the proper tensioning. If too tight, under the force of the idler tensioning spring, it can cause the accelerated wear of idler shaft and bushing, track shoe and its pin, also lead to the pitch of track shoe elongate.
2. Keep the idler alignment. If not, will leads to other undercarriage parts (such as lower roller, upper roller, sprocket, track shoe) abnormal wear.
Our Service
♦ 100% quality assurance, development and manufacturing follow original ones;
♦ One-to-one products factory. Ensure the best quality;
♦ Reasonable inventory and timely delivery;
♦ Rapid response within 24 hours ;
♦ Long-term strong and stable supply capacity;
♦ Goods will Be packed safely and carefully;
♦ The first-class logistics to Ensure the safe arrival of your goods;
♦ Excellent After-sales service. Track usage. Positive feedback response;
We focus on the development positioning of providing customers with a full range of quality Front Idler for Hitachi Cx500 Crawler Crane and services, and strive to make the company a world class enterprise with global competitiveness. We got best suppliers support on quality and price. In order to ensure customer satisfaction, we use expert-level services, tailor-made for customers, and provide a full range of product solutions.
Hot Tags: crawler crane idler, China, suppliers, manufacturers, factory, buy, Bulldozer Track Shoe, Track Link Assembly, Bulldozer Upper Carrier Roller, Sprocket, Track Shoe Bolts And Nuts, Split Master Link Bolts
[[ProKeywords]]SPEC DATA
Send Inquiry