
Excavator Track Chain Track Link PC200 PC240 PC220 Track Link Assembly 20y-32-00013
Product Introduction
We are confident that we would be your best choice if you are looking for Mini Excavator Bottom Roller, Crawler Crane Upper Roller, Crawler Crane Idler manufacturer with class-leading quality and professional services. We are looking forward to establish long-term, mutual beneficial partnership with even more customers with our professional attitude, leading-edge craftsmanship and quality services. We have established good cooperative relations with our raw material suppliers. We will thoroughly understand your every need providing you with a suitable solution design to achieve the best cost performance. Since our company was established, we have been abiding by the business principle of "Quality First, Credit First" and implementing the quality policy of "Quality for Survival, Innovation for Market Expansion". We solemnly promise to all sectors of society that we would like to verify and show our super comprehensive strength through your comprehensive investigation and comparison.
Track Link Assembly is the track group with shoes, which is also called track shoe plate, track shoe assy, it is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc. Excavator track group with shoes is made by rolling, machining, heat treatment, painting etc. The quality and working life depends on the quality of rolled steel, the hardness of hardening and tempering, the depth of hardness lay.
Our Advantage:
• Material: 35MnB, high strength, abrasion resistant steel
• Track Bushing: 20CrMo, carburizing treatment both outside and inside, hardness depth 2.5 to 3mm.
• Heat Treatment: water quenching technology
• Machining: CNC CONTROLLED MACHINES
• Chain Models: link pitch from 101 to 260mm. .
Machining Process: Forging —Rough Turning —Heat Treatment—Flow Detection —Finish Turning — Assembly— Spraying Paint
Production Information

Specification:

NO | DIMENSION | MODEL APPLICABLE | |||||||||
A | B | C | H | I | O | P | Q | S | U | ||
1 | 101 | 22 | 40 | 55 | 55 | 35 | 32 | 19 | 10.5 | 94 | EX35, YC35-6/7 |
2 | 135 | 46 | 40 | 80 | 104 | 54 | 35.2 | 22.3 | 13.5 | 140 | R60 |
3 | 135 | 46 | 41 | 55 | 85 | 31.6 | 35 | 22.5 | 12.5 | 114 | PC40-5 |
4 | 135 | 46 | 41 | 63.8 | 93.8 | 40.4 | 35 | 22.5 | 12.5 | 124 | PC40-7/8 |
5 | 135 | 43.2 | 42.5 | 72 | 99 | 44 | 41 | 24 | 12.5 | 141 | PC60-5, D20 |
6 | 140 | 52 | 44 | 86 | 86 | 55 | 40 | 28 | 14.5 | 139 | YC85 |
7 | 154 | 55 | 47.5 | 90 | 90 | 56 | 46.3 | 30 | 14.5 | 158 | EX60 |
8 | 154 | 57 | 44 | 73 | 89 | 45 | 41.2 | 24 | 14.5 | 130 | PC60-6/7, PC75 |
9 | 154 | 57 | 44 | 82.4 | 112.4 | 49.4 | 46.3 | 30 | 14.5 | 170 | PC100-3, D31 |
10 | 171 | 60.3 | 55.57 | 108 | 108 | 58.6 | 47 | 30 | 16.5 | 170 | SK100, SK120 |
11 | 171 | 60.3 | 55.57 | 108 | 108 | 70 | 50.3 | 33.5 | 16.5 | 181 | EX100, E312, E120B, SH120, EC140 |
12 | 171 | 58.7 | 56.3 | 125.4 | 144.5 | 83.5 | 54 | 36.65 | 16.5 | 212 | R200, SE210-1, SE210LC, R210LC-2 |
13 | 175 | 57 | 54 | 86.4 | 102.4 | 50.4 | 46.3 | 30 | 16.5 | 170 | PC100-5/6, PC120-6 |
14 | 175 | 57 | 54 | 122.4 | 158.4 | 84.6 | 55 | 38 | 18.5 | 218 | HD700, HD770 |
15 | 175.4 | 58.7 | 57.2 | 125.4 | 144.5 | 77.5 | 58.75 | 36.5 | 18.5 | 214 | EX200-1, SH280 |
16 | 190 | 69 | 58 | 119.6 | 155.6 | 82.2 | 58.8 | 36.6 | 20.5 | 220 | E200B, SH200, SK200, E320 |
17 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 18.5 | 220 | PC200-3, PC220-1/2/3, EX200-2/5, ZX210 |
18 | 190 | 62 | 58 | 124.4 | 160.4 | 81.6 | 59 | 38 | 20.5 | 220 | PC200-5/6/7, DH220-5, EX220 |
19 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 20.5 | 244 | EX300-1, PC300-2 |
20 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 22.5 | 244 | PC300-5 |
21 | 203 | 72 | 62 | 129 | 179 | 94 | 64 | 42 | 20.5 | 235 | E325 |
22 | 203 | 76.2 | 58 | 148.2 | 186.2 | 112.4 | 66.8 | 44.6 | 19.5 | 254 | R944 |
23 | 203 | 72 | 58 | 138.4 | 178.4 | 101.6 | 66.8 | 44.6 | 18.5 | 244 | D60, D65, TY160 |
24 | 203 | 72 | 60 | 146 | 184 | 108 | 66 | 45 | 20.5 | 250 | T160, T140, T120 |
25 | 203 | 76.2 | 58 | 133.4 | 171.4 | 102.4 | 69.7 | 44.5 | 19.5 | 232 | D6D |
26 | 203 | 68 | 64 | 137.3 | 185.3 | 101.3 | 72.7 | 44.5 | 20.5 | 232 | D6H |
27 | 216 | 76.2 | 63 | 140.4 | 178.4 | 101.6 | 66.5 | 44.6 | 22.5 | 242 | PC300-6/7, EX300-5 |
28 | 216 | 76.2 | 63 | 146 | 184 | 106 | 71 | 47 | 22.5 | 252 | EX400-1, PC400-1/3, DH450 |
29 | 216 | 76.2 | 69 | 140 | 190 | 103 | 68 | 46 | 22.5 | 248 | E330 |
30 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 24.5 | 252 | PC300-3/5, SH330, SH300, PC410-5 |
31 | 216 | 76.2 | 63 | 146 | 184 | 106 | 74.3 | 47 | 20.5 | 252 | D80, D85, TY220, TY230 |
32 | 216 | 76.2 | 64.3 | 146 | 184 | 108 | 71 | 47.7 | 19.5 | 252 | D7G |
33 | 228 | 76.2 | 71.4 | 144 | 184 | 109 | 71.5 | 47 | 24.5 | 254 | PC400-6 |
34 | 228 | 76.2 | 71.4 | 169 | 219 | 121.6 | 79 | 48.5 | 24.5 | 292 | D155, D150, TY320 |
35 | 228 | 76.2 | 71.4 | 169.8 | 201.6 | 121.6 | 80.4 | 50.8 | 23 | 292 | D8K |
36 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 85.3 | 57 | 27.5 | 321 | EX700, ZX1000 |
37 | 260 | 76.2 | 87.3 | 184.2 | 235 | 133 | 92 | 57 | 27.5 | 321 | D355, PD410, D9H, D9G |
Package And Service

Track Link Maintenance
Before enabling the track link, first check whether the link assembly is operating normally and whether the tension of the saw chain is normal.
Remember to close the chain brake before starting so as to stop the track link assembly and prevent danger during startup. But loosen the chain brake before work, otherwise the bearing will be damaged.
When the track link assembly rotates, be careful not to rub against the ground or other objects.
The link assembly should be oiled and applied with anti-rust paint in a timely manner. Once the track link assembly is rusted, it should be replaced in time to improve work efficiency.
Check and maintain the link assembly frequently, repair it in time if there is a broken link or disconnection, and find out the cause.
Our company adheres to the development strategy of internal management and external market, and wholeheartedly creates the latest and best new Excavator Track Chain Track Link PC200 PC240 PC220 Track Link Assembly 20y-32-00013 for the majority of new and old customers and provides the most satisfactory service. Our company is looking for agents sincerely. Our company adheres to the business philosophy of 'integrate resources, optimize channels, serve customers, and win-win cooperation', and is committed to providing customers with first-class products and services, thereby saving the costs of customers.
Hot Tags: track link assembly, China, suppliers, manufacturers, factory, buy, Crawler Crane Upper Roller, Sprocket, Bulldozer Lower Track Roller, Hydraulic Pump, Segment Bolt Nut, Hydraulic System
[[ProKeywords]]SPEC DATA
Send Inquiry